For B2B SaaS sales orgs and SDR teams

Every ramp week is full salary against a fraction of quota.

A new mid-market AE takes 22 to 30 weeks to reach full quota, and every one of those weeks is paid at the full loaded rate. Your enablement lead can build the scenarios and your methodology is already on the wall. What nobody has time to build is the fifty graded conversations that turn week twenty-six into week eighteen.

22 to 30Weeks to full quota for a new mid-market AE
$165 to $215KFully loaded cost per quota-carrying rep
30 to 45%Average attainment across the ramp period
What changes

How a rep ramps with practice reps

A new mid-market AE takes 22 to 30 weeks to reach full quota, and every one of those weeks is paid at the full loaded rate. Your enablement lead can build the scenarios and your methodology is already on the wall. What nobody has time to build is the fifty graded conversations that turn week twenty-six into week eighteen.

How a rep ramps today

Today
  • Two weeks of onboarding, a certification deck and a call library
  • The first discovery call is run live, on a real account
  • Conversation intelligence explains the call after it is already lost
  • Coaching depends on which manager had a free hour that week
  • You find out a hire is not going to make it in month five

How a rep ramps with practice reps

With SalesCoach
  • Onboarding ends in fifty graded conversations, not a quiz score
  • The first ten discovery calls are run against nobody's pipeline
  • The rep rehearses the named account before the call happens
  • The same rubric grades every call, whoever was free that week
  • The skill curve is readable in week two, not in month five
The arithmetic

What the ramp weeks you are carrying cost

This table computes time rather than a conversion rate, because you already budget in loaded cost per rep and can produce every input in a minute. Hiring plan, loaded cost, current ramp, attainment across it. Then multiply.

InputWhat a VP of sales usually saysValue
Quota carriers hired per year6 to 128
Fully loaded cost per rep, with tools and manager time$165 to $215K$185,000
Loaded cost per rep per week$185,000 over 52$3,558
Weeks to full quota today22 to 3026
Average attainment across those weeks30 to 45%40%
Ramp weeks carried against no quota, per rep26 at 60%15.6
Unproductive ramp cost, one cohort of eight8 x 15.6 x $3,558$444,000 a year

Attainment during ramp is the input worth arguing about, so pull it rather than taking the middle column. It is the one number on this sheet your own board deck already contains, which is what makes the total survive a second reading. Loaded cost means salary, commission at target, tools and the manager time the rep consumes, not base salary. Every figure in the right-hand column is yours to replace, including the definition of full quota, which every org sets differently. Moving ramp from 26 weeks to 18 takes each rep from 15.6 unproductive weeks to 10.8, which is $136,800 back across a cohort of eight.

What you get

What you actually get

Four things, and they run whether or not anyone has time to run them.

Buyers built from your ICP

The prospect on the other end pushes back the way yours do: we already use a competitor, send me something, this is not budgeted this year, and security will never approve it. Built from your own lost deals and your own personas, not a generic library.

Graded on your methodology

MEDDIC, Command of the Message, or whatever is actually on your wall. Discovery, pitch, objection handling, closing and rapport map to your rubric at your weights, because on this floor the reps read the rubric and a generic one gets picked apart in session one.

Your real calls, graded too

Upload the recordings you already keep and they come back transcribed and scored on the same rubric as the practice calls. One standard across rehearsal and live, which is what makes a ramp comparison across two cohorts mean anything.

Ramp you can watch

Assign a path, see the per-rep skill trend and the whole floor in one view. The point is not the dashboard, it is that a hire who is not going to make it is visible in week two rather than at the first quota review.

How it runs

How it runs

The sequence, and roughly how long each part takes.

1Week 1

Your rubric goes in first

Your methodology, your stages and your language, loaded before a single call runs. This is the one vertical where a generic scorecard ends the program in the first session, so we do not start with one.

2Week 1

We build your buyers

Your ICP, your competitors and the four deals you lost last quarter, turned into prospects who argue about your actual category rather than a made-up one.

3Weeks 1 to 3

SDRs go first

The opener, the permission ask and the first brush-off, drilled daily. Sixty seconds a call and high volume, so there is a real number inside three weeks rather than at the end of the quarter.

4Month 2 on

AEs rehearse discovery, then named deals

Discovery against your own rubric, then pre-call rehearsal on real accounts using that account's notes. That last one is what senior reps opt into, and it is what makes the practice permanent.

Questions

Questions

The ones that come up before anyone signs anything.

Keep it. Conversation intelligence tells a manager what happened on a call that is already lost. This makes the rep run the call before it happens. They measure different halves of the same problem, and the honest test is to run both for a quarter and compare ramp weeks across two cohorts.

Price your own ramp weeks

Start free and run one SDR through the opener gym, or send us your hiring plan, loaded cost and ramp definition and we will do the table above on your team.